How this is calculated
Slab: L × W × thickness. Footing: L × width × depth. Wall: L × height × thickness. Column: π × (diameter ÷ 2)² × height × quantity. Volume ÷ 27 = cubic yards; the waste % is then added on top.
Pick the shape you are pouring, enter the dimensions and a waste allowance, and get the exact volume to order, the weight, how many ready-mix truck loads or 80 lb (40 kg) bags it equals, plus a DIY batch recipe and an optional cost estimate.
Results are estimates for planning purposes only. Real-world quantities depend on site conditions, materials and workmanship. Always verify measurements, follow local building codes and confirm quantities with your supplier or a qualified professional before ordering or building.
About the Concrete Calculator
Ordering concrete is one of the easiest places to waste money on a project. Order too little and you pay a short-load fee or end up with a cold joint where two loads meet. This calculator turns your dimensions into exactly what the supplier needs: cubic yards for a ready-mix truck, or a bag count for mixing on site. It handles slabs, footings, walls, columns and steps.
How to use
- Choose the shape that matches your pour: slab, footing, wall, column or stairs.
- Enter the length, width and thickness — for example, a 10 by 12 foot patio at 4 inches thick.
- Set a waste percentage: 5 percent for simple rectangles, 10 percent for irregular shapes or uneven ground.
- Pick cubic yards for ready-mix delivery, or 40, 60 or 80 lb bags for site mixing.
- Check the truckload estimate: each mixer carries about 10 cubic yards, and small orders trigger short-load fees.
Understanding your results
Cubic yards is the number the ready-mix plant asks for — order it rounded up. The bag count is your home-center shopping list, and truckloads show how many mixers the job needs. Under about 2 yards, compare the bagged price against the delivery minimum before calling the plant.
How the calculation works
Volume is length times width times thickness in feet, giving cubic feet; dividing by 27 converts to cubic yards. The waste percentage is added on top. For bags, cubic feet are divided by yield per bag: about 0.6 cubic feet for an 80 lb bag, 0.45 for 60 lb, 0.3 for 40 lb. Truckloads are cubic yards divided by 10, rounded up.
Concrete Calculator FAQs
How many 80 lb bags of concrete are in a cubic yard?
How much concrete do I need for a 10x10 slab that is 4 inches thick?
What is a short-load fee and when does it apply?
How thick should a concrete slab be?
How long does concrete take to cure before I can use it?

Written by
Nabil Sharif
Founder of CalcDune — a free library of 137 online calculators for finance, health and everyday math. Every calculator shows the formula behind its result, so you can see exactly how your numbers are worked out.
More articles by Nabil →